Seawall & dock help·Gulf Shores
West Beach Gulf front · Your waterfront project

West Beach Seawall, Bulkhead and Dune Rules in Gulf Shores

A new seawall on West Beach, Gulf Shores, is usually not allowed. New walls, pools and decks are barred between the tide line and a state control line, so this guide shows what you can still build.

Describe your project on this page ↓
West Beach waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.West BeachLittle Lagoon PassChildress PointWest Beach waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.West BeachLittle Lagoon Pass
Land and water: U.S. Census Bureau TIGERweb, 2026. Reference points: USGS GNIS and the U.S. Census Bureau geocoder. General orientation only; not a survey, flood map or service boundary.

West Beach Gulf front at a glance

Who permits it
City of Gulf Shores, under delegation from ADEM
Call first
City Building Department, (251) 968-1150
The water
Open Gulf, with tides of only about 1.4 feet
Local rule to know
No new structure between the tide line and the control line

Get to know your waterfront

West Beach is the Gulf-front strip west of Little Lagoon Pass, along West Beach Boulevard (Highway 182). The City of Gulf Shores issues the permits, because the state handed it the coastal program for the beach. The city line reaches west to about longitude -87.80, and Gulf-front land beyond it falls under the county. Every job is measured against the Coastal Construction Line (CCL), not a water edge.

City of Gulf Shores Building Department, Building Permitting Procedures Handbook (2025) · Coastal Permitting Information · TIGERweb Census Current (2026) Legal and Statistical Entities, Incorporated Places layer (January 1, 2026 vintage), point-in-polygon queries · Art. VII Gulf Front Beaches and Dunes, Sec. 7-122(b), (c), (f)

What a West Beach owner can and cannot build on the Gulf front

A new seawall seaward of the control line is not allowed. A wall behind it is allowed only to save an existing building. The Gulf-front armoring guide gives the state background.

Who issues the permit for Gulf-front work on West Beach?

The City of Gulf Shores does. The Alabama Department of Environmental Management (ADEM) delegated the beach-and-dune part of its coastal rule to the city, so the city building office is your first stop. ADEM delegation City handbook

A lot the control line crosses needs a city permit or a consistency determination. The application needs a stamped boundary survey that shows the line and its monument numbers. City handbook

The city code reaches past the city limits for sand removal and the line itself. Code reach Beyond about longitude -87.80, the county permits Gulf-front parcels. Census limits

Where is the control line, and what are the monuments?

The line is a surveyed boundary, not a mark on the sand. City code fixes it by state plane coordinates between named monuments, from ADEM B 19 and GS-1 through GS-29. City code, monuments

The state uses its own series, BC-0 to BC-48. Between BC-19 and BC-20 the line sits 40 feet inland of the dune crest. In city zones mapped as BTL and BCR in July 1984, it sits 5 feet inland. ADEM line definition

Hire the surveyor first. A submission needs state plane coordinates from a registered surveyor, with the distance to the nearest monument. ADEM permit rule

What is barred between the tide line and the control line?

Almost everything. No new structure or substantial improvement may sit on, under or above land between mean high tide (the average high-tide line) and the control line. City code 7-122 The zoning code calls this strip the Gulfside Yard. Zoning 6-3D

Work in the Gulfside Yard (tide line to control line)
ItemAllowed seaward of the line?
Dune walkover
Yes, if it meets the walkover standard
Sand fencing
Yes
House, deck or gazebo
No
Pool, drive or parking
No
Bulkhead, wall or fence
No
New septic system
Barred unless no sewer is available

Sources: Zoning 6-3D City code 7-121 City code 7-122

When can a wall go behind the line?

Only when all three tests are met. City code 7-122 ADEM rule

  1. The wall sits landward of the line.
  2. It protects an existing or previously permitted building.
  3. No nonstructural option, retreat included, can do the job.

ADEM lists the options to rule out first: rebuilding dunes, nourishment and moving back. ADEM alternatives Gulf-beach riprap follows the same road, with ADEM approval first. City code 7-123

A bulkhead counts as a structure here, like a deck, pool or parking lot. Work costing 50 percent or more of fair market value is a substantial improvement, and you file a certified cost declaration. City code 7-121

Variances are narrow. ADEM grants one only if the rule is unduly restrictive or amounts to a taking, with a legal argument and a deed on file. The city's control-line board hears local requests. ADEM variance rule City code 7-123

What may you do with sand, dunes and walkovers?

Nobody may remove dune or beach sand, even sand blown or washed onto a lot, from land south of Highway 182 without a city permit. Permitted sand goes back into the beach and dune system. City code 7-122(a)

A walkover is the one path built for foot traffic. The state defines it as a raised path no more than 6 feet across, without a roof or sides, set a foot or more above the dune. ADEM definition The city walkover permit for a home is $50. City fee schedule

Sand fences under the beach mouse plan use wood slats and posts no larger than 2x4, and none go seaward of the primary dune line. Beach mouse plan

Which beach mouse and sea turtle rules come with the lot?

Developable land west of the pass sits inside the federal beach mouse plan for single-family homes, on both sides of Highway 182. Plan area Only lots zoned R1 or R2 qualify. Plan eligibility

Where mouse habitat is present, the U.S. Fish and Wildlife Service recommends an Incidental Take Permit, which costs $100 to process. USFWS guidance Repairs inside the original footprint usually need none, but ask before adding a pool or enlarging the house. USFWS repairs

  • The city lighting rule runs May 1 through November 30. Zoning 6-12G
  • Fixtures may not be directly visible from the beach, and walkovers take only eyelid or louvered step lights. Zoning 6-12G
  • Enrolled owners move beach gear at least 100 feet north of the tide line before sundown. Beach mouse plan

What have storms and sand done on West Beach?

West Beach has taken real surge. FEMA's Katrina study logged high-water marks of 8.5 to 11.5 feet on the open Gulf here and at Dauphin Island. FEMA Katrina marks Ivan scoured sand from under some beachfront homes until they collapsed. NHC Ivan report

The 2023 restoration reached this side of the pass on November 27, 2023 and ran west to the Bon Secour refuge. City schedule The Little Lagoon Pass guide covers how the pass shapes this beach.

What flood rules apply to the house behind the dune?

In V zones and coastal A zones, the lowest horizontal structural member must be a foot or more above base flood elevation. The building must stay landward of mean high tide, on piles or columns, with no structural fill. City code 7-92

The city set a three-foot freeboard in 2005 after Ivan, then cut it to one foot in 2017 after FEMA raised base flood elevations. City staff memo Open-Gulf tides at the Gulf State Park pier gauge swing only about 1.4 feet, so surge and waves drive the damage, not the tide. NOAA pier datums The flood zone guide covers elevation certificates.

What should a West Beach owner do next?

  • Ask an engineer whether dune work, a walkover or moving a structure beats a wall.
  • Book a seawall assessment for any older wall landward of the line.
  • Ask a licensed contractor about cap and panel repair for an existing wall.

The permit overview covers the steps. Lagoon-side lots behind Highway 182 follow a different rulebook, in the south shore guide.

What could the work cost?

Fees come first on West Beach. ADEM charges $2,545 for a hardened structure on beaches and dunes and $1,665 for one house or duplex on a control-line parcel. The city adds a $1,100 newspaper notice for homes. Wall cost depends on an engineer's design, so get a site review before you budget.

These are published prices, not a quote. Local numbers come from Baldwin County public bids and Orange Beach permits. National guides fill the gaps and are labeled as national. Your wall depends on height, access, soil and permits.

Compare quotes and plan a budget →

Find the relevant permits and records

West Beach Gulf front researched starting points
Starting pointWhat to resolvePrepare and look up
City of Gulf Shores Building Department
Permit for any structure on a parcel the control line crosses
Stamped survey with monument numbers, certified cost declaration, and the $1,100 newspaper notice for homes. Call (251) 968-1150.
ADEM Coastal Program, Mobile
State review of hardened structures and homes on beaches and dunes
City control-line board
Local variance requests under the state variance rule
A written case that the rule is unduly restrictive, with a certified deed copy and proof that impacts are minimized.
U.S. Fish and Wildlife Service, Daphne
Beach mouse habitat and sea turtle questions before a building permit
Ask for a written site visit. The processing fee for an Incidental Take Permit is $100. Call (251) 441-5181.
City floodplain administrator (Chief Building Official)
Floodplain permit and V-zone certificate for homes behind the dune
Elevation certificate before and after framing, plus an engineer-signed V-zone certificate.

Prepare the questions for the responsible office.

Records to pull before you plan Gulf-front work

Four lookups answer most West Beach questions.

  1. Find your control line position

    Ask the city for the monument numbers near your lot, then have a surveyor plot the line on your parcel.

    Art. VII Gulf Front Beaches and Dunes, Sec. 7-121(a) · City of Gulf Shores Building Department, Building Permitting Procedures Handbook (2025)

  2. Request your elevation certificate

    City records go back to 1998. A home older than that needs a fresh survey.

    FAQs - Building Department | Gulf Shores, AL

  3. Call ADEM's coastal office

    Ask whether a wall or riprap proposal has any chance before you pay a designer. The office is in Mobile.

    Alabama Coastal Area Management Program (ADEM Coastal Program page)

  4. Ask for a beach mouse site visit

    Send the Daphne field office a written request for a visit. Keep its reply with your permit file.

    Building Permits and the Alabama Beach Mouse · Contact Us, Alabama Ecological Services Field Office

Start with what you know

Send your West Beach request

Tell us your street, whether the lot touches the control line and what you hope to protect. A local marine contractor or engineer will call to talk through what the line allows.

Built on Gulf Shores and Baldwin County permit rules, Alabama coastal law, public bids and storm records.

Prefer to talk it through?(251) 850-8500

Getting your form ready…

West Beach Gulf front project questions

Can I build a new seawall on West Beach?

Usually not. A wall is allowed only behind the control line, only to protect an existing building, and only if no nonstructural fix works. Nothing new may go between the tide line and the line.

Gulf Shores Code Ch. 7, Art. VII Construction and Other Activities on Gulf Front Beaches and Dunes (Municode) · Art. VII Gulf Front Beaches and Dunes, Sec. 7-122(b), (c), (f)

How do I know where my control line is?

A surveyor plots it from state plane coordinates and the nearest monument, such as GS-1 through GS-29. The city asks for that stamped survey with your application.

Art. VII Gulf Front Beaches and Dunes, Sec. 7-121(a) · ADEM Admin. Code Chapter 335-8-2, rule 335-8-2-.08 Construction and Other Activities on Gulf Front Beaches and Dunes

Can I haul sand off my West Beach lot?

Not without a city permit. The rule covers sand moved by wind or water, and approved sand goes back into the Gulf-front beach and dune system.

Art. VII Gulf Front Beaches and Dunes, Sec. 7-122(a)

When does a repair count as a substantial improvement?

When it costs 50 percent or more of the structure's fair market value, or it adds height or footprint. You then file a certified cost declaration, and the city can suspend the permit if the revised cost reaches that line.

Art. VII Gulf Front Beaches and Dunes, Sec. 7-121

Does flood insurance pay for a damaged seawall?

Not under the federal flood policy, which leaves out seawalls, bulkheads, retaining walls, piers and docks. Ask your insurer what, if anything, covers the wall.

44 CFR Part 61, Appendix A(1), Standard Flood Insurance Policy, Dwelling Form

Keep planning

Nearby waterfront guides

East Beach & the public beach, Little Lagoon south shore & west end, Little Lagoon Pass & the Callaway Bridge

View the local guide directory.

Show sourcesHide sources
  1. City of Gulf Shores Building Department, Building Permitting Procedures Handbook (2025)Source reviewed 2026-11-01
  2. Coastal Permitting InformationSource reviewed 2026-10-31
  3. TIGERweb Census Current (2026) Legal and Statistical Entities, Incorporated Places layer (January 1, 2026 vintage), point-in-polygon queriesSource reviewed 2026-10-31
  4. Art. VII Gulf Front Beaches and Dunes, Sec. 7-122(b), (c), (f)Source reviewed 2026-11-01
  5. Gulf Shores Code Ch. 7 Arts. I, V, VI, VII and Zoning Ordinance Art. 4Source reviewed 2026-11-01
  6. ADEM Admin. Code Chapter 335-8-1, rule 335-8-1-.02(p) definition of construction control lineSource reviewed 2026-11-01
  7. ADEM Admin. Code Chapter 335-8-2, rule 335-8-2-.08 Construction and Other Activities on Gulf Front Beaches and DunesSource reviewed 2026-10-31
  8. Zoning Ordinance for the City of Gulf Shores, as amended by Ord. No. 2228 (dated Sept. 14, 2026)Source reviewed 2026-11-01
  9. ADEM Admin. Code r. 335-8-2-.06 Shoreline Stabilization and Erosion MitigationSource reviewed 2026-10-31
  10. Gulf Shores Code of Ordinances Sec. 7-4 Building permit fees (Municode)Source reviewed 2026-11-01
  11. General Conservation Plan for Single-family/Duplex Residential Development in Alabama Beach Mouse Habitat (June 12, 2012)Source reviewed 2026-11-01
  12. Building Permits and the Alabama Beach MouseSource reviewed 2026-10-31
  13. High Water Mark Collection for Hurricane Katrina in Alabama, FEMA-1605-DR-AL, Final Report (URS Group for FEMA)Source reviewed 2026-10-31
  14. Tropical Cyclone Report: Hurricane Ivan (AL092004)Source reviewed 2026-11-01
  15. Beach Restoration Update (posted Oct. 25, 2023)Source reviewed 2026-11-01
  16. Art. IV Flood Damage Prevention, Sec. 7-92Source reviewed 2026-11-01
  17. Council memo: Freeboard Requirements FEMA Flood Maps (Aug. 16, 2017)Source reviewed 2026-11-01
  18. NOAA CO-OPS Metadata API: Datums, station 8731269Source reviewed 2026-11-01
  19. Building Permits | Gulf Shores, ALSource reviewed 2026-11-01
  20. Alabama Coastal Area Management Program (ADEM Coastal Program page)Source reviewed 2026-10-31
  21. ADEM Admin. Code Chapter 335-1-6 Application Fees, adopted rule effective October 15, 2026Source reviewed 2026-10-31
  22. Contact Us, Alabama Ecological Services Field OfficeSource reviewed 2026-10-31
  23. FAQs - Building Department | Gulf Shores, ALSource reviewed 2026-11-01
  24. 44 CFR Part 61, Appendix A(1), Standard Flood Insurance Policy, Dwelling FormSource reviewed 2026-10-31