Bulkhead cost per foot in Baldwin County ran $256 to $611 for vinyl in 2022 public bids. Nearby Orange Beach permit values for 2026 work out to $360 to $420 a foot.

Nearby 2026 permit values, just east of Gulf Shores

The nearest published job values with a wall length come from Orange Beach, the city just east of Gulf Shores. They put 2026 vinyl and repair work at about $360 to $420 per foot of wall.

These are values owners declared on permit applications, not bills. Treat them as a neighbor benchmark, not as a Gulf Shores price. No Gulf Shores list prints job values with lengths.

Orange Beach 2026 permits: declared value and value per foot
Work on the permitDeclared valuePer foot
Wood wall out, 166 ft of vinyl in
$70,000
about $420
New 180 ft seawall, material not stated
$65,000
about $360
256 ft of vinyl, old aluminum wall removed
$96,000
about $375
Reface 75 ft with vinyl sheets
$29,000
about $390
Tie rods, 70 ft of wood, new cap
$29,000
about $415

Sources: Orange Beach vinyl permit Orange Beach 180 ft permit Orange Beach 256 ft permit Orange Beach reface permit Orange Beach tie rod permit

Bottom line: a vinyl reface and a full replacement landed within about $30 a foot of each other in the same year.

Canal lots cost differently from open-water lots. See the Gulf Shores canal lot guide and the bulkhead replacement service guide.

Bulkhead cost per foot: Baldwin County public bids

The best local price evidence is a county bid sheet. At the county's Lillian boat launch on Perdido Bay, six contractors bid a 295-foot vinyl sheet pile wall in October 2022. Their prices ran from $256 to $611 per foot, and the middle bid was about $445. Lillian bid tabulation

The high bidder was about double the low bidder. One quote is not a market price. Plan with the middle of three written bids, not the lowest.

Seeing signs of damage? Run the warning-sign check.Optional · 10 quick questions · no contact info needed

Go by what you already know. Stay on firm ground, and do not walk to the edge or wade in to look. “Not sure” is an acceptable answer to any question.

Skip ahead to the budget calculator

1. Holes, sinking ground, or soil washing out behind the wall?
2. Is the wall leaning or bulging toward the water?
3. What cracks have you noticed?
4. Gaps, missing pieces, or soil coming through the joints?
5. Is the top broken or crumbling, or is metal showing?
6. Are there rust stains on the wall?
7. Does water come over or through the wall at very high tides?
8. Has there been a major storm since the wall was last checked?
9. About how old is the wall?
10. When was the last professional inspection?
What this check is based on

The questions follow the warning signs owners most often notice along salt and brackish water: soil loss behind the wall, movement, open joints and damaged concrete. They help you describe what you see; they are not an inspection.

A simple starting point

Plan your seawall budget.

Three questions to get started. “Not sure” is welcome. No contact details needed.

Prefer to talk? Tell us about your project

An approximate length is fine.

Where can I find the wall length?

Look for the waterfront length on your property survey or seawall plans. For example, enter 75 for a wall that is about 75 feet long. If you cannot find it, tick “I don’t know the length yet”. Stay on safe ground; you do not need to measure beside the water.

Add height & site details Optional

Add what you know about the wall and access. We’ll include these details in your result so you can discuss how they affect the work and price.

Help with the height measurementTop of capWaterline (changes)Mudline / bottomBuried embedmentExposed height

Use the height from the bottom beside the wall (the mudline) to the top of the wall cap. Include the part under water. Use plans or a survey; leave this blank if you don’t know. Do not enter the full panel length or a survey elevation such as NAVD88. The buried depth and required top elevation come from the site design.

Use a price you’ve received Optional
Where the price comes from

Have a price for your actual property? Select it above to add known extras and a reserve.

You can download after viewing your result.

Your result

Ready when you are.

Choose “Show my result” after answering the three questions.

How the numbers work

For a published range, we multiply the price per foot for your chosen material by your wall length. It is a starting point. Height, ground conditions, equipment access, permits and other work can change the final price. The source does not give enough detail to price those changes, so the calculator lists them as questions to check.

Have a price for your property? Enter it to add known extra costs and the reserve you choose. Anything without a price stays on your checklist. For repairs or a height change, get a price for that specific work.

The wall’s bottom-to-top height, the buried panel depth and the cap elevation shown on a survey are different measurements. An engineer uses the ground, nearby structures, drainage and water conditions to design the wall. Approvals and drawings for a shoreline job are explained on ADEM coastal permitting information and in the joint ADEM and Corps application. The calculator uses the residential price sources shown above, not public-project costs from these documents.

Your next step

Talk about your seawall project.

Tell us about the problem. We’ll call to discuss your options and help you plan the next steps toward getting it fixed.

You can ask for help with or without a calculator result.

Prefer to talk it through?(251) 850-8500

Getting your form ready…

What could your seawall cost?

These are published prices, not a quote. Local numbers come from Baldwin County public bids and Orange Beach permits. National guides fill the gaps and are labeled as national. Your wall depends on height, access, soil and permits.

Six bidders priced vinyl wall for a Baldwin County boat launch between about $256 and $611 a foot, and the middle bid was near $445. Orange Beach permits from 2026 show about $375 to $420 a foot. One quote is one data point, not a market price.

Repair prices by type

Repair prices are for the affected feet only. Price the whole wall only when the whole wall is failing.

Repair price per foot
WorkAmountWhat the price coversArea and source
Small cracks
$100-$180
per foot of wall; Sealing small cracks
United States (Angi, October 2026) [3]
New caps and tiebacks
$125-$230
per foot of wall; New concrete caps and tiebacks
United States (Angi, October 2026) [3]
Joint grouting
$100-$125
per foot of wall; Grouting open joints
United States (Angi, October 2026) [3]
Secondary anchors
$225-$300
per foot of wall; Added anchors behind the wall
United States (Angi, October 2026) [3]
Soil stabilization
$120-$270
per foot of wall; Stopping soil loss behind the wall
United States (Angi, October 2026) [3]
Leaning wall
$200-$600
per foot of wall; Straightening or bracing a leaning wall
United States (Angi, October 2026) [3]
Reface with vinyl, 75 ft
$390-$390
per foot of wall; Rotting wood face boards replaced with vinyl sheets, $29,000 declared on a March 2026 permit
Orange Beach, Alabama (job values owners declared on 2026 permits) City of Orange Beach Community Development
Tie rods, wood and cap, 70 ft
$415-$415
per foot of wall; Stainless tie rods, 70 ft of rotten wood and a new cap, $29,000 declared on a July 2026 permit
Orange Beach, Alabama (job values owners declared on 2026 permits) City of Orange Beach Community Development

New-wall prices per foot

Local rows come first. National rows are labeled as national and are not Alabama prices.

New-wall price per foot of wall
Material / workPrice per foot of wallArea, included work and source
Vinyl, public bids, 295 ft
$256-$611
Baldwin County, Alabama (Lillian public bids, 2022) · Vinyl sheet pile wall complete in place, 295 ft, six bidders; the middle bid was about $445. Old-wall demolition was extra. Baldwin County Commission Purchasing (tabulation by Sawgrass Consulting)
Vinyl, national guide
$200-$600
United States (Angi, October 2026) · Installed vinyl wall per Angi; HomeAdvisor shows the same range for a wall about five feet tall. [15]
Vinyl, wood-to-vinyl, 166 ft
$420-$420
Orange Beach, Alabama (job values owners declared on 2026 permits) · Old wooden wall pulled out and 166 ft of vinyl installed; $70,000 declared on a July 2026 permit. City of Orange Beach Community Development
Vinyl, canal wall, 256 ft
$375-$375
Orange Beach, Alabama (job values owners declared on 2026 permits) · 256 ft of vinyl sheet pile with demolition of 40 to 60 ft of aluminum wall; $96,000 declared on an April 2026 permit. City of Orange Beach Community Development
Composite, one Texas contractor
$250-$400
Texas Gulf Coast (one Houston marine contractor, 2026 page) · Fiberglass-and-resin composite bulkhead. No Alabama composite price was found; this single source is shown for scale only. [9]
Concrete, national guide
$200-$800
United States (Angi, October 2026) · Poured or precast concrete wall per Angi. No Baldwin County concrete bid was found. [15]
Concrete, HomeGuide
$200-$600
United States (HomeGuide, 2023) · Concrete wall, installed national range, page dated April 2023. [1]
Steel, national guide
$250-$700
United States (Angi, October 2026) · Steel sheet pile wall per Angi. No Baldwin County residential steel bid was found. [15]
Steel, HomeGuide
$200-$600
United States (HomeGuide, 2023) · Steel wall, installed national range, page dated April 2023. [1]
Hybrid concrete-and-vinyl system
$500-$1,200
United States (HomeGuide, 2023) · A Truline-type system (rebar and concrete cast inside a vinyl sheet-pile form), installed. Least pinned-down material. [1]
Timber, public bids, 127 ft
$419-$725
Baldwin County, Alabama (Seminole Landing public bids, 2018) · Timber bulkhead, 127 ft, three bidders at $419, $585 and $725 per foot. Prices have moved since 2018. Baldwin County Commission / Highway Department
Wood, national guide
$150-$500
United States (Angi, October 2026) · Wood wall per Angi. Treated wood is the shortest-lived material in the guides. [15]
Riprap rock, national guide
$70-$400
United States (Angi, October 2026) · Riprap revetment per Angi; HomeGuide lists $50 to $200 for riprap or boulders. [15]
Living shoreline, national guide
$50-$350
United States (HomeGuide, 2023) · Living shoreline per HomeGuide. Fits low-energy shores only; see the living shoreline guide. [1]
Wall, material not stated, 180 ft
$360-$360
Orange Beach, Alabama (job values owners declared on 2026 permits) · "Build 180 foot seawall" at $65,000 declared on a July 2026 permit. The material is not stated. City of Orange Beach Community Development

50-, 75- and 100-foot examples

Multiply the wall length by the price per foot. The table multiplies each published range by 50, 75 and 100 feet. It leaves out permits, engineering and extras.

Wall cost by length of wall
Material / work50 feet75 feet100 feet
Vinyl, public bids, 295 ft
$12,800-$30,550
$19,200-$45,825
$25,600-$61,100
Vinyl, national guide
$10,000-$30,000
$15,000-$45,000
$20,000-$60,000
Vinyl, wood-to-vinyl, 166 ft
$21,000-$21,000
$31,500-$31,500
$42,000-$42,000
Vinyl, canal wall, 256 ft
$18,750-$18,750
$28,125-$28,125
$37,500-$37,500
Composite, one Texas contractor
$12,500-$20,000
$18,750-$30,000
$25,000-$40,000
Concrete, national guide
$10,000-$40,000
$15,000-$60,000
$20,000-$80,000
Concrete, HomeGuide
$10,000-$30,000
$15,000-$45,000
$20,000-$60,000
Steel, national guide
$12,500-$35,000
$18,750-$52,500
$25,000-$70,000
Steel, HomeGuide
$10,000-$30,000
$15,000-$45,000
$20,000-$60,000
Hybrid concrete-and-vinyl system
$25,000-$60,000
$37,500-$90,000
$50,000-$120,000
Timber, public bids, 127 ft
$20,950-$36,250
$31,425-$54,375
$41,900-$72,500
Wood, national guide
$7,500-$25,000
$11,250-$37,500
$15,000-$50,000
Riprap rock, national guide
$3,500-$20,000
$5,250-$30,000
$7,000-$40,000
Living shoreline, national guide
$2,500-$17,500
$3,750-$26,250
$5,000-$35,000
Wall, material not stated, 180 ft
$18,000-$18,000
$27,000-$27,000
$36,000-$36,000

For example: 75 ft × $256-$611/ft = $19,200-$45,825. This is arithmetic on a published range, not a bid for your lot.

What to include in your price

A price per foot only means something when you know what it covers. Ask each bidder to list these items.

  • The wall material, sheet length, gauge or thickness, and the height above the water.
  • Removal and disposal of the old wall, or a written plan to drive the new wall in front of it.
  • Tiebacks or deadmen, the cap, and the backfill, priced per foot or per cubic yard.
  • Engineering, survey and drawings, plus who pays the permit fees and who files the paperwork.
  • Mobilization, barge or access work, site restoration, and what happens if the soil surprises the crew.

Check what your price includes · Find your permit office

National price guides by material

Where no local bid exists, national guides give a range per foot of installed wall. They average the country and are not Alabama prices. The table gives Angi's 2026 range and HomeGuide's 2023 range for each material. [15]

National installed price per foot by material
MaterialAngi (Oct 2026)HomeGuide (2023)
Vinyl
$200 to $600
$200 to $550
Steel
$250 to $700
$200 to $600
Concrete
$200 to $800
$200 to $600
Wood
$150 to $500
$150 to $500
Riprap rock
$70 to $400
$50 to $200
Living shoreline
not listed
$50 to $350

Sources: [15] [1]

  • HomeGuide prices a hybrid system (concrete cast inside vinyl sheet piling) at $500 to $1,200 per foot. [1]
  • One Houston contractor lists composite walls at $250 to $400 per foot. That is a single Texas source, shown for scale only. [9]

For how materials hold up in salt water, read the bulkhead materials guide.

Repair prices per foot

Repairs are priced on the feet that need work, not the whole wall. HomeGuide puts non-structural repairs such as caps, tiebacks, grout and soil work at $100 to $250 per foot, and replacing badly damaged sections at $150 to $600. [1]

Angi repair prices per foot (national)
RepairPrice per foot
Restoring cracked panels
$450-$600
Toe or berm failure
$300-$600
Joint separation
$250-$500
Leaning wall
$200-$600
Secondary anchors
$225-$300
Soil stabilization
$120-$270
New concrete caps and tiebacks
$125-$230
Small cracks
$100-$180
Joint grouting
$100-$125

Sources: [3]

Not sure whether to repair? Read repair or replace. Cap work is covered in the cap and crack repair guide, and anchor work in the tiebacks and anchors guide.

What a whole wall adds up to

HomeGuide's national table shows how total cost grows with length. A 100-foot wall runs $15,000 to $60,000, and the national average is $35,000. [1]

Total cost by wall length (national)
Wall lengthHomeGuide total
25 feet
$3,800 to $15,000
50 feet
$7,500 to $30,000
100 feet
$15,000 to $60,000
150 feet
$22,500 to $90,000
200 feet
$30,000 to $120,000

Sources: [1]

Angi's table for longer runs shows 300 feet of concrete at $60,000 to $240,000 and 700 feet at $140,000 to $560,000. [15]

Those totals leave out engineering, permits and extras. Use the 50-, 75- and 100-foot examples in the calculator above for a quick check.

Why two walls of the same length cost different amounts

Height, access, saltwater and site conditions move the price more than the material name does. HomeAdvisor says a five-foot vinyl wall costs $200 to $600 per foot, and eight- to ten-foot walls nearly double it. [2]

  • Access. When heavy machines cannot reach the shore, crews must build access first, and that raises the price. [2]
  • Salt water. Angi says saltwater walls generally cost twice as much as freshwater ones. [15]
  • Job difficulty. HomeGuide tiers walls as standard ($150 to $400), medium ($400 to $600, including barge work) and complex ($600 to $1,000, with hard access or large backfill). [1]

Permit and paperwork fees

Government fees are usually small next to the wall. Engineering and survey are the bigger paperwork costs. Marine engineering plans for a permit run $2,000 to $3,000 in HomeGuide's guide, and Angi lists a site survey at $800 to $5,500. [1] [15]

Agency fees that apply to a typical residential wall
AgencyFeeNote
ADEM, 50 ft or less
$1,000
Bulkhead or riprap, non-Gulf shore
ADEM, over 50 ft
$1,665
Adopted effective Oct 15, 2026
ADEM, Gulf-front wall
$2,545
Beach and dune rule
ADEM, private pier or dock
$800
Pile-supported
State Lands request
$100
Application fee
Corps general permit
$0
Individual permit $10 if non-commercial
Gulf Shores bulkhead permit
$50
Plus $25 application fee
Baldwin County marine permit
$75 flood + 1.5%
Plus $15 data and $10 issuance
Foley riparian permit
$75
Repair permit $25

Sources: ADEM fee schedule ADEM Gulf-front fee ADEM pier fee State Lands application fee Corps permit fee Gulf Shores fees Baldwin County fees Foley riparian fees

An older ADEM schedule from February 2026 ($800 and $1,330) still circulates, and ADEM Form 328 still prints a $700 wall fee. Use the later schedule. ADEM February 2026 schedule ADEM Form 328

See the permit guide for who files what. The Gulf-front fee applies on the Fort Morgan Gulf side; see the Gulf-front armoring guide.

Docks, piers and boat lifts

Saltwater piling work costs more than the lake prices in national guides. Angi's 2026 national average for a dock is $15,048, with floating docks at $15 to $40 per square foot. [16]

  • Orange Beach 2026 boat lift permits show job values from $11,805 to $24,258, with a $28,000 four-piling lift in 2025. Orange Beach lift permits
  • Whole pier-and-boathouse jobs there ran $48,000 to $180,000 in 2026. Orange Beach pier permits
  • Baldwin County bid public timber piers and boardwalks at $110 to $351 per square foot. Public work adds engineering, rails and wage rules. Baldwin County pier bids
  • Angi puts boat lifts at $2,000 to $20,000 nationally, about $8,000 on average. [16]

More in docks and boat lifts. Plash Island owners should read the Plash Island dock guide.

Riprap and living shoreline prices

Riprap (loose rock along the shore) is priced by the ton or the square yard on public bids. Baldwin County's 2023 Live Oak Landing bid listed $100 per ton for smaller stone and $150 per ton for the 24- to 30-inch class. Live Oak Landing bid

  • The 2021 ICW boat launch bid priced Class 2 riprap at $74 per ton. ICW boat launch bid
  • The 2024 county launch at CR 6 priced installed riprap at about $71 to $175 per square yard by thickness. CR 6 launch bid
  • Living shoreline projects in Baldwin County are public reef and breakwater jobs. The 2012 Swift Tract reefs came to roughly $260 per foot of shoreline protected. Nature Conservancy fact sheet
  • Clemson Extension, citing NOAA, says living shorelines may need up to $100 per foot per year in upkeep against up to $500 for bulkheads. Clemson Extension

See the living shoreline guide and riprap service guide.

Public waterfront jobs run to seven figures

Public owners treat Gulf and bay bulkhead work as big jobs, and the permit is often the long wait. ADCNR called Corps permitting the hardest challenge for new boat ramps. ADCNR boating access bulletin

  • Weeks Bay Reserve's East Gateway bulkhead removal and marsh restoration has a recommended $3.5 million. NOAA Office for Coastal Management
  • The Pelican Point park at Weeks Bay, with ramps and bulkheads, is estimated at nearly $1.7 million. Fox10 report
  • Baldwin County set aside $500,000 for Mullet Point Park on County Road 1, and that money is not expected to cover its aging seawall, boat ramp and pier. Fox10 report

None of these can be turned into a price per foot. They show scale, not a home budget. The Weeks Bay jobs are covered in the Weeks Bay and Fish River guide.

Reading a quote next to these prices

Ask every bidder to split the price into lines so you can compare them. A single lump sum hides the differences. The checklist in the calculator lists what to ask for. Check the contractor with the contractor verification guide.

  1. Wall price per foot, naming the material, the sheet length and the thickness.
  2. Removal of the old wall, or the plan to drive the new one in front of it.
  3. Tiebacks, cap and backfill.
  4. Engineering, survey and permit fees, and who files them.
Bottom line: on the Lillian job the low vinyl bid was $256 a foot and the middle of six was about $445. Plan on the middle. Lillian bid tabulation

Words on a bid that look unfamiliar, such as tieback, deadman or toe, are defined in the seawall glossary. To match a price to the problem, start from the services page.

Show sourcesHide sources

How to use these prices

Local evidence comes first: Baldwin County public bid tabulations (2022 and 2018) and 2026 Orange Beach permits, where the declared job value is divided by the wall length printed on the permit. Orange Beach is a neighbor city, so those rows are labeled with their own geography. National guides from Angi, HomeAdvisor and HomeGuide fill the gaps for steel, concrete, hybrid and riprap. No range was widened beyond its source, and every row shows its publisher and the date it was checked.

Price and technical sources

  1. HomeGuide. Seawall Costs - Bulkhead & Lake Seawall Costs Per Foot. United States (national). Source reviewed 2026-11-01
  2. Angi. How Much Does It Cost to Repair a Seawall [2026 Data]. United States (national). Source reviewed 2026-10-31
  3. Angi. How Much Does It Cost to Build a Seawall? [2026 Data]. United States (national consumer guide). Source reviewed 2026-11-01
  4. Shore Protect Construction (Houston, TX). Bulkhead Texas: Construction and Repair Cost Breakdown. Texas (contractor's service area). Source reviewed 2026-10-31
  5. HomeAdvisor (Angi). How Much Does It Cost to Build a Sea Wall? [2026 Data]. United States (national). Source reviewed 2026-11-01
  6. Angi. How Much Does It Cost to Build a Dock? [2026 Data]. United States (national consumer guide). Source reviewed 2026-11-01
  7. Shore Protect Construction (Houston, TX). Bulkhead Cost Per Foot: $150-$650 by Material (2026). Texas Gulf Coast and inland lakes (contractor's service area). Source reviewed 2026-10-31
  8. JKT Marine. Aluminum Sheet Pile Seawall Installation South Florida. South Florida (contractor's service area) - cost context only. Source reviewed 2026-10-31
  9. Alabama Bid Network. Bid Results on Maintenance Dredging Of Little Lagoon Pass. Little Lagoon Pass, Gulf Shores, Alabama. Source reviewed 2026-11-01
  10. HomeAdvisor (Angi). How Much Does It Cost to Build a Dock?. United States (national). Source reviewed 2026-10-31
  11. HomeGuide. Cost To Build A Dock - Prices By Type & Size. United States (national). Source reviewed 2026-11-01
  12. HomeGuide. Boat Dock Repair Costs - By Damage, Material, & Part. United States (national). Source reviewed 2026-10-31
  1. WG23-03 - Certified Bid Tabulation, Lillian Boat Launch (Sawgrass bid tabulation, October 2022)Source reviewed 2026-10-31
  2. City of Orange Beach Permits, March 2026 (permit copies)Source reviewed 2026-10-31
  3. City of Orange Beach Permits, July 2026 (permit copies)Source reviewed 2026-10-31
  4. City of Orange Beach Permits, April 2026 (permit copies)Source reviewed 2026-10-31
  5. Seminole Landing Boat Launch - Bid Tabulation (BCP 0206816)Source reviewed 2026-10-31
  6. ADEM Admin. Code Chapter 335-1-6 Application Fees, adopted rule effective October 15, 2026Source reviewed 2026-10-31
  7. ADCNR Admin. Code r. 220-4-.09 Placement and Configuration of Piers and Other Improvements on State Owned Submerged LandsSource reviewed 2026-10-31
  8. 33 CFR 325.1 Applications for permits, paragraph (f) FeesSource reviewed 2026-10-31
  9. Gulf Shores Code of Ordinances Sec. 7-4 Building permit fees (Municode)Source reviewed 2026-11-01
  10. Baldwin County Building Inspection Department Fee Schedule (effective 10/01/2023, updated 10/01/2024)Source reviewed 2026-11-05
  11. City of Foley Code Ch. 4, Art. VIII Shoreline Construction Activities (Secs. 4-221 to 4-232), Ord. No. 1024-08Source reviewed 2026-10-31
  12. APA-3 certification, ADEM Rule 335-1-6-.07 Payment of Fees (adopted December 12, 2025), Fee Schedule BSource reviewed 2026-10-31
  13. ADEM Form 328, Application for a Permit for the Construction of Single Family Dwellings, Duplexes, or Other Similar Structures on Properties Intersected by the Construction Control Line (rev. 5/14)Source reviewed 2026-10-31
  14. City of Orange Beach Building Department Monthly Reports - 2025 and 2026 Permits (permit copies)Source reviewed 2026-10-31
  15. The Launch at CR 6 - Bid Tabulation (HW21103000), read with the ICW Boat Launch certified tabulation (https://open.baldwincountyal.gov/BidsDoc/Doc/ICWCertifiedBidTabulation.pdf)Source reviewed 2026-10-31
  16. Certified Bid Tab for Live Oak Landing Boat Launch RepairsSource reviewed 2026-10-31
  17. Project No. BCP 0203120 - Certified Bid Tabulation (Baldwin County Intracoastal Waterway Boat Launch)Source reviewed 2026-10-31
  18. Living Shorelines: Swift TractSource reviewed 2026-10-31
  19. How Much Does It Cost To Install A Living Shoreline?Source reviewed 2026-10-31
  20. Boating Access Continues to Improve on Alabama Gulf CoastSource reviewed 2026-11-01
  21. Shoreline Restoration to Enhance Coastal Resilience within the Weeks Bay National Estuarine Research ReserveSource reviewed 2026-11-01
  22. Eastern Shore waterfront parks to receive GOMESA-funded improvementsSource reviewed 2026-11-01

Get help with your seawall.

Tell us where your property is and what your seawall or dock needs.

Built on Gulf Shores and Baldwin County permit rules, Alabama coastal law, public bids and storm records.